Sunday, November 27, 2011
Mars Science Laboratory Liftoff!
MSL is officially underway! Curiosity -- a rover the size of an SUV, nuclear powered, carrying 10 science instruments including a Canadian-built APSX spectrometer -- will search for signs of past life in Gale Crater on Mars, hypothesized to be an ancient lakebed. From an engineering perspective, the landing may be the most exciting part as JPL's new "sky crane" will be used to deposit the rover on the surface. Read more about the mission in this CBC article.
Tuesday, November 22, 2011
Searching for Methane on Mars(Dome)
This past week we ran a field deployment in the MarsDome to search for a methane source using a rover. The rover moved around mapping the terrain and gathering spectrometer readings in order to narrow down the location of the source. It's a bit like playing Battleship, but with robots! Next summer we'll be heading up to Axel Heiberg Island in the Canadian High Arctic to simulate this mission with a real methane source at a site called Lost Hammer Spring.
Keith Passes FOE
Keith successfully defended his PhD thesis on Nov 17; Prof. Hong Zhang from the University of Alberta was the external examiner. Congrats, Dr. Leung!
Thursday, November 3, 2011
Computer and Robot Vision (CRV) 2012
Tim will be acting as the Co-Chair of CRV2012 along with Prof. Philippe Giguère from Université Laval. The Call for Papers is now available on the conference website. The conference will be in Toronto next year from May 27 to 30, held at York University, just a few minutes from UTIAS.
Tuesday, November 1, 2011
Dry Runs for Mars Analogue Mission
Thursday, October 20, 2011
ASRL's New Tour Guide
Update: check out the post-flight gallery
Monday, October 3, 2011
Sunday, September 25, 2011
Thursday, September 22, 2011
Leaving the Nest
Yesterday both Andrew Lambert and Colin McManus gave their Departmental Masters Seminars, completing their requirements for their MASc degrees. Also, Dr. Paul Furgale passed his Final Oral Examination for his PhD degree on September 7 with Prof. David Wettergreen (CMU) serving as the external examiner. Congrats and thanks to all!
Monday, September 12, 2011
Another Field Season Comes to an End...
...well, not quite. Most of our team made it out of Mistastin today and are relaxing in Goose Bay. The crazy die-hard members stayed behind to help long-line the robot back to an airstrip by helicopter tomorrow (the winds were too high today) and will hopefully come out by Twin Otter tomorrow afternoon. Job well done by everyone, especially given the bugs, cold, rain, and high winds over the last few weeks. 'Till the next time...
Wednesday, September 7, 2011
Pushing the Limits
Week 2 of testing has been going well so far. The rover has gone on 1-2 traverses per day to explore various sites of interest identified by the science backroom. Lots of gigapans, lidar scans, and core samples have been taken. The science team has really been pushing the limits of the rover’s capabilities in order to get an in-depth look at several intriguing locations near the original landing site, which has been very exciting to watch. Based on the data collected by the astronauts last week, the rover is continuing to build a geologic understanding of the rim of Mistastin Impact Structure.Monday, September 5, 2011
Robotic Operations Continue at Mistastin
Today the second week of robotic operations began at Mistastin. The astronaut team has left the ridge camp for a second location, leaving behind the rover team to do followup tasks for the next five days. Today the rover traversed back to an outcrop on top of a ridge using its lidar vision sensor in order to conduct further scientific investigations. Hopefully the backroom science team will command the robot to some new locations in the coming days.
Saturday, September 3, 2011
"Mistastin" Means High Winds
The robotic operations in our first week at Mistastin impact crater concluded well. Today we were supposed to move camp and exchange some personnel. But, in classic Mistastin form, the winds are very strong and our helicopter isn't able to fly. We're in waiting mode until the weather clears. Update: the winds got up to 104 km/h. Most of the camp evacuated to some nearby cabins, but our rover team bunkered down in the rover tent to make sure all the equipment was safe. It was quite a fun night in the end.
Wednesday, August 31, 2011
ROC6 Joins Lunar Analogue Mission Operations
Tuesday, August 30, 2011
ROC6 Summits on Nearby Ridge
Sunday, August 28, 2011
Hurricane Irene on its way!
Saturday, August 27, 2011
ROC6 Rolls Out
Friday, August 26, 2011
Arrived at Mistastin Lake
It's been a rough few days. We deployed safely to Mistastin Lake shore via Twin Otter and the next day to our field site near the crater rim. It was a long day of slinging gear under the helicoptor but we got it all here. There's a cute bear cub living nearby, hopefully his mother isn't around. There was a huge storm in the night and it ripped the roof off our rover tent. Luckily we got it under control and nothing was damaged. The ROC6 is in good shape and we've done some dark navigation experiments already. We're all a little worried about Hurricane Irene as we may be in the track. Starting navigation experiments tomorrow.
Tuesday, August 23, 2011
Arrived in Goose Bay
Our team and gear has made it to Goose Bay. It's looking like we'll deploy to Mistastin Lake impact crater over the next two days; we were delayed today due to bad weather. The ROC6 is alive and well, despite a mangled shipping crate.
Tuesday, August 16, 2011
Field Deployment to Mistastin Impact Crater
The ROC6 has been shipped to Northern Labrador and our team will depart on Aug 22 to Goose Bay. We'll be meeting our collaborators from UWO and deploying by Twin Otter to the Crater. Watch this space for news and the Mistastin 2011 Web Album for images.
Subscribe to:
Posts (Atom)

